Industrial & LogisticsCompleted
10th of Ramadan Logistics & Chemical Storage Hub
Project Overview
A state-of-the-art logistics complex spanning over 60,000 m² of storage facilities in the 10th of Ramadan industrial cluster. The facility required high chemical resistance, abrasion durability under heavy forklift traffic, and moisture protection against subterranean seepage.
The Engineering Challenge
Continuous heavy axle loads from 5-ton forklifts and exposure to accidental chemical spills required high abrasion resistance and non-dusting surfaces.
The CRO CHEM Solution
CroCoat protective coating system combined with CroFix MegaBond for heavy ceramic floor tile installation provided exceptional bond strength and impact absorption.
Project Information
Technical Highlights
Surface hardness increased by over 40% based on Taber abrasion testing
Engineered Applications
Heavy-Duty Industrial FlooringChemical Spill ResistanceLoading Dock Protection